Customization: | Available |
---|---|
After-sales Service: | Available |
Warranty: | 1 Yaer |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specifications and models | GJJ/2-25 |
Material properties | Temperature: 0-90ºC |
Rated flow (power supply 380V-50Hz) | ≥1000L/h |
Maximum working pressure | 25Mpa |
Fixed work stress | 20MPa |
Feed pump pressure | 0.3-0.4MPa |
Adapt to material liquid temperature/viscosity | 100ºC/≤5000CP |
Rated motor power KW | 15 KW |
Dimensions cm | 141×85×119cm |
Machine weight Kg | 750kg |
20Ton/Hour Milk, Yogurt Production Line Equipment
Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory.
And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city.
Contact our sales people you can get video of our reference running machine
Q2: Do you have after-service stations?
A2: our engineer can go to overseas for aftersales service
Q3: Do you provide customized service
A3: We can design the machines according your requirements(material ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.
Q4: What's your guarantee or the warranty of the quality if we buy your machines?
A4: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q5: How long time for installation?
A5: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.